Our company has the largest number of dredging equipment in Taiwan. The dredging equipment consists of two 12,000 HP dredgers built by I.H.C. Holland, one 6,600 HP dredger, and one grab dredger built by Kawasaki Shipbuilding Corporation in Japan. In addition, there are a variety of boats, such as Multicats, lift ships, tug boats, traffic ships, survey boats, pontoon boats, and so on.
READ ALLThe construction teams of our company have been working on harbor construction for many years. They are full of experiences in the harbor construction; therefore, the quality of construction is excellent. Among these projects, our company studied and developed an offshore gauntry, utilized this innovative method to drive P.C. piles, and completed perfectly. Besides, our teams worked day and night and completed 921 Earthquake Reconstruction Project of Taichung Harbor No. 1 and No. 2 Wharf in advance.
READ ALLOur company contracts the third tender Cofferdam Project of South Fill Area of Taichung Harbor, which belongs to offshore riprap breakwater closing up section. The current of this section is swift. An innovative method, prearrangement of breakwater, was adopted to shorten the time and complete the project. Our company conquered tempestuous waves at the open sea of Taichung Harbor and smoothly completed the project.
READ ALLThe drainage project of the outlet of river and metropolitan drainage system are extremely difficult one. It tests contractor’s construction ability. The construction teams of our company passed the test and completed the project. The completed projects are as follows: Drainage System in Industry Park: the first stage of No. 3, No. 4, and No. 5 sectionalized box culvert project in Tainan Technology Industrial Park River Drainage System: Refinement Project of Yan-Shui Creek (the fourth and the fifth area) in Tainan City and Town Drainage System: Drainage System Project of D Line in Special Zone of Taichung Harbor Drain Ditch Bridge and Connecting Road Project of An-Liang Harbor in Taichung Harbor Road Projects: New Construction Project of Chung-Heng 1st Road of Taichung Harbor (including one four-hole bridge) New Construction Project of East Side Road of Specialized Zone (I) of Taichung Harbor
READ ALLFoundation Pile Driving Projects
Foundation Pile of Prestressed Concrete: Fuel Tank Foundation Pile Project of East No. 6 Wharf of Taichung Harbor (onshore) New Construction Project of No. 20 Wharf of Taichung Harbor (offshore) New Construction of Chung-Heng 1st Road of Taichung Harbor (including four-hole bridge)
Steel Sheet Pile:
New Construction Project of No. 22 and No. 23 of An-Ping Harbor in Tainan The Second Stage New Construction Project of North Bank Revetment of An-Ping Harbor in Tainan New Construction Project of Chun-Pin East 4th and East 6th Wharf of Taipei Harbor
Bank Revetment Project of Chinese Petroleum Corporation LNG Receiving Station (drum type steel sheet pile) Project of 570C Section of Hsin-Chuang Line of Taipei Rapid Transit
Steel Pipe Pile:
Bank Revetment Reconstruction Project of No. 7 Wharf of An-Ping Harbor in Tainan Follow-up Construction Project of West 6th Wharf of Taichung Harbor
Pressed Sand Pile:
New Construction Project of No. 22 and No. 23 Wharf of An-Ping Harbor in Tainan (refinement of soil part) Bank Revetment Project of North Taiwan LNG Receiving Station of Chinese Petroleum Corporation (refinement of soil part)
HungHua has the largest dredging fleet in Taiwan. The superior ability of the HungHua's professional team in planning, design and operation has greatly enhanced the company's competitive advantage and ability in the dredging market.